Fabrication

IMG_2425 IMG_2423 IMG_2424

Yellow Falls Trash Rack

Gorf was contracted to fabricate and install a trash rack at the Yellow Falls Hydro Station. The trash rack was roughly 55ft deep x 60ft wide x 40ft high with 60 panels surrounding the structural steel. Panels were roughly 15ft x 18ft.

 

Hoyle Pond – Ice Platform

 

Hoyle Pond – E House

 

Superior Propane – Fabricate tank skid

Gorf was contracted to fabricate a 10ft x 83ft long large tank skid with a design load of 340,000lbs.

 

Dyno Nobel – Unloading Platforms

Gorf was contracted to design, engineer, and fabricate two unloading platforms. The platforms were 10ft x 32ft and 10ft x 22ft.  

 

Barrick Tanks

Gorf was contracted to fabricate and deliver a 16ft x 4ft diameter rubber lined detox standpipe, a 13ft x 4ft diameter rubber lined floatation conditioning standpipe, a 16ft x 10ft diameter rubber lined floatation conditioning tank, and a 30ft x 24ft diameter.