Mechanical

Calabrian

Gorf was contracted to fabricate and install roughly 20ft of 6” diameter XS piping for S02 service. The piping had to be fabricated and installed in accordance with ASME B31.3. The existing piping was clogged with solidified sulphur. Gorf workers had to safely cut into the existing piping to remove the clogged section without exposing themselves to poisonous gas or chemical burns.

 

IMG_2196

Certarus 

Gorf was contracted to fabricate and install roughly 1500ft of 2”, 4”, and 6” diameter XXS piping for Natural Gas service. The piping had to be fabricated and installed in accordance with ASME B31.3 and CSA B149.1. The majority of this piping was installed below ground and had to be hydrostatically tested to 7500 psi and pneumatically tested to 1500 psi. 

 

KL Gold 

Gorf was contracted to fabricate and install roughly 200ft of 4” and 6” diameter XS piping for Propane service. The piping had to be fabricated and installed in accordance with ASME B31.3 and CSA B149.1.