Structural

Barrick Hemlo: Williams Mine – J#11-3069

Work Description: Wash Bay Facility – This contract consisted of Gorf constructing a wash bay facility including a reinforced concrete foundation, drainage trenches and hydronic heating loops. Gorf supplied and erected the pre-engineered building that is approximately 85 feet by 60 feet by 65 feet complete with overhead doors and man doors.